Last Call 2026 has ended. New prices are in effect.

Build your pool and see the price

Pick your door, pick a package or build your own, pick the model, change anything you like. The price updates as you go. Hold your place with the $1,000 deposit, the most California lets a pool builder take up front.

Your package is saved

Morgan has your build. Pay the $1,000 deposit when you are ready, or start a new one.

The price list did not load. Refresh the page, or call or text (559) 544-2345 and we will build the price with you.

1Pick your door

Three ways in. Pick one, then a package, then change anything you like below.

2How much do we do?

Your package picks one of these. Change it here if you like.

2Pick your pool

Every Latham model we build, with its Hanford price. Tap one.

3Base or Complete

Both are a finished, swimming pool. Complete adds the finishing touches most families ask for.

4Dirt

The dig leaves a pile of soil. Most yards have room to spread it; if yours does not, we haul it away.

5Plumbing

Schedule 40 PVC either way. Larger pipe lets the pump run slower for the same flow.

6Equipment

Pentair, sized for the pool you picked.

7Heater

Gas heats fast. A heat pump costs less to run and needs no gas line.

8Sanitizer

9Extras

Add what you want. Anything else gets its own line on your estimate after the site visit.

Your package

Card payment through Stripe. The deposit goes toward the pool.

Pick a poolto see your Hanford price